1
The Challenge
Repeated equipment failures with no clear cause
Persistent PLC and VFD malfunctions, frequent electronic card failures, and nuisance tripping across production lines — with no apparent cause from standard maintenance checks.
•275 transient events in 30 minutes at main production panel — up to 457V magnitude
•158 events in 60 min on production line — neutral-to-ground voltage reaching 11–12V
•56 events in 40 min on another line — high oscillatory and impulse transients
•101 events in 53 min — automation systems under continuous stress
•Root cause: continuous switching of industrial loads generating repetitive transients across the distribution system
2
The Action
Measure first — then solve
Pre-installation Power Quality Audit using a Class A analyser — capturing transient events, magnitudes, and neutral-to-ground voltage across all critical panels before recommending any solution.
→Site measurement at all critical production panels — transient capture at 200kS/sec
→Root cause analysis — identified transient sources and propagation paths
→TVSS installed at main incomer (L-L-L-G) and sensitive load incomers (L-N-G)
→Dedicated surge protection at each VFD, PLC, and SMPS section
→Post-installation audit conducted 3 months later to verify performance through data
3
The Results
Verified by post-installation measurement
93%
Reduction in transient events
0.72V
Neutral-to-ground voltage achieved
Transient events (30 min)
275
→
20
Transient magnitude
Up to 457V
→
Very small
Voltage profile
Unstable
→
Stable
N-G voltage
Elevated
→
0.72V
4
The Benefits
Impact across three dimensions
✓Technical — Drastic reduction in transient magnitude and frequency, improved voltage stability, safe neutral-to-ground voltage levels
✓Operational — Reduced PLC and VFD malfunction incidents, reduced unplanned production downtime, improved process continuity
✓Maintenance — Fewer electronic card failures, lower frequency of maintenance interventions, reduced risk of unexpected shutdowns
✓Long-term — Extended service life of sensitive automation equipment and reduced total cost of ownership
Facing similar challenges at your facility?
Talk to our engineers — we will assess your electrical system and recommend the right solution.
More case studies being added across EMS, Harmonic Mitigation, LV Panels, and ISO 50001 engagements.
Energy Management Systems
Harmonic Mitigation
Power Quality Audit
LV Panels
ISO 50001